← Back to home

Case Studies / 02

Vision &
Ramps

Practical access and vision upgrades that create safer, clearer and more inclusive school environments.

Featured projects

Vision and ramps
St George Girls High School – Accessibility & Vision Upgrades

St George Girls High School – Accessibility & Vision Upgrades

Accessibility and vision upgrade works were completed at St George Girls High School, including concrete and asphalt works, new handrails, tactile indicators and high-visibility markings. These upgrades provide students with safer, clearer access routes and improved visibility when navigating throughout the school grounds.

→
Hurstville Campus – Vision Upgrade

Hurstville Campus – Vision Upgrade

The Hurstville Campus Vision Upgrade involved improvements throughout the school, including the installation and enhancement of handrails, tactile indicators and other visual safety features. These works provide clearer identification of pathways, stairs, entry and exit points, creating a safer and more accessible environment for current and future students.

→
Rydalmere Public School – Vision & Softfall Upgrades

Rydalmere Public School – Vision & Softfall Upgrades

Vision upgrade and softfall works were completed at Rydalmere Public School to create a safer and more accessible environment for students. The works improved visibility throughout key areas while providing upgraded softfall surfaces to enhance safety within the school grounds.

→
Sylvania Heights Public School – Vision Upgrades

Sylvania Heights Public School – Vision Upgrades

Vision upgrade works were completed throughout Sylvania Heights Public School to improve safety, visibility and accessibility for students. The works included new line marking, installation of tactile indicators and asphalt rectification across various areas of the school grounds, providing safer and more clearly defined access paths.

→
Turramurra Public School – Access Points & Pathways Upgrade

Turramurra Public School – Access Points & Pathways Upgrade

Vision upgrade works were completed throughout Turramurra Public School to improve visibility and safety for students navigating the school grounds. The works included highlighting key access points, pathways, steps and other areas to provide clearer visual identification and support safer movement around the school.

→
Crestwood Public School Vision Upgrade

Crestwood Public School Vision Upgrade

The Crestwood Public School Vision Upgrade included line marking to steps and play areas, along with highlighted handrails to improve visual identification throughout the school. These works enhance safety and accessibility by clearly defining key areas, pathways and level changes for students and staff.

→
Sylvania High School Accessible Ramps

Sylvania High School Accessible Ramps

A new accessibility ramp was constructed at Sylvania High School to provide improved access for students to the designated seating area. The works created a safer and more accessible pathway, supporting inclusive access throughout the school grounds.

→
Mimosa Public School Accessible Ramp

Mimosa Public School Accessible Ramp

Mimosa Public School required improved access to its play area within a restricted existing space. The solution involved reconfiguring and reducing the existing steps to accommodate a compliant accessibility ramp, creating a safer and more inclusive pathway for students and staff. The completed works made effective use of the available space and were very well received by the school community.

→
Mortdale Public School – Accessible Ramp Upgrade

Mortdale Public School – Accessible Ramp Upgrade

Mortdale Public School required improved accessibility to provide safe and inclusive access to its school buildings. Two new concrete pathways were constructed to integrate with the accessibility ramp, creating a smooth and practical transition between existing areas and allowing easier access for students, staff and visitors with mobility requirements.

→
Carlton South Public School – Vision & Ramps Upgrade

Carlton South Public School – Vision & Ramps Upgrade

Carlton South Public School underwent accessibility improvement works to one of the school blocks, including mesh screens, a new accessibility ramp and step treads. The upgrades provide safer and more inclusive access to the building, ensuring the facilities can be comfortably accessed by all.

→
Bald Face Public School – Accessibility Ramps

Bald Face Public School – Accessibility Ramps

New concrete accessibility ramps were installed at Bald Face Public School to provide safer, easier access to classrooms, the main school building and demountable classrooms. The works included level concrete pathways, integrated landings and metal safety rails, creating practical and inclusive access routes for students, staff and visitors with mobility requirements.

→
Miranda Public School Accessible Ramp

Miranda Public School Accessible Ramp

A new accessibility ramp was constructed at Miranda Public School to provide safe and convenient access to a classroom that previously had no suitable ramp access. The upgrade provides students with a smoother and easier transition into the classroom, improving accessibility and safety for all users.

→