Reliable works that keep educational facilities safe, functional and ready for daily use.

Featured projects

Maintenance works
Carlton Public School – Library Upgrade

Carlton Public School – Library Upgrade

Carlton Public School’s library underwent a comprehensive transformation, creating a modern, functional and welcoming learning environment for students and staff. The upgrade included new carpet, a kitchenette, book-return counter, office furniture and PC storage cabinetry, along with an extension to the existing mezzanine and a dedicated meeting room to maximise the library’s space and functionality.

→
Cherrybrook Public School – Outdoor Seating Area Upgrade

Cherrybrook Public School – Outdoor Seating Area Upgrade

Cherrybrook Public School received a new concrete slab to transform an underutilised outdoor area into a practical and accessible space for students. The upgrade provides a safe, level and durable surface, allowing students to make better use of the school grounds for seating, socialising and enjoying their breaks.

→
Girraween Public School – Building Restoration Works

Girraween Public School – Building Restoration Works

Restoration works were completed to a nominated building block at Girraween Public School. Works included thorough cleaning, sanding back existing surfaces, preparation and repairs where required, followed by the application of specified final paint coatings. The completed works provide a clean, durable and refreshed finish.

→
Turramurra Public School – Asphalt Rectification Works

Turramurra Public School – Asphalt Rectification Works

Asphalt rectification works were completed at Turramurra Public School to address uneven surfaces and level changes caused by ongoing tree-root growth. The works improved pathway levels and removed potential trip hazards, providing a safer and more accessible environment for students, staff and visitors.

→
Peakhurst South Public School – Concrete Entrance Walkways

Peakhurst South Public School – Concrete Entrance Walkways

Peakhurst South Public School received new concrete entrance pathways and gates, providing safer and more clearly defined access for students entering the school grounds while helping separate adjoining school areas. Additional works included converting an existing storeroom into a functional sick bay, complete with a viewing panel to improve supervision, visibility and student wellbeing.

→
Bald Face Public School – Facility & Accessibility Upgrades

Bald Face Public School – Facility & Accessibility Upgrades

Bald Face Public School underwent a range of significant upgrades, including construction of a new connecting pathway incorporating a circular section beneath an existing tree. This created a continuous route for students to safely enjoy bicycles and scooters. Additional works included widening classroom doorways to improve accessibility and circulation, along with reconfiguring the library service desk into a functional U-shaped design with increased workspace and an integrated book-return facility.

→
Carinya School Maintenance Works

Carinya School Maintenance Works

Carinya School underwent an extensive range of maintenance and improvement works designed to enhance the functionality, security and overall presentation of the school. Works included construction of a new covered shelter, replacement of sliding doors with new fixed glass panels, installation of new fencing, and new concrete slabs to accommodate three purpose-built storage facilities. These included a three-door sliding shed for the ride-on mower and tools, a single roller-door shed for play equipment, and a smaller shed for plant and landscaping materials. Further upgrades included perforated mesh with synthetic grass and perforated-mesh fencing panels, a complete office upgrade and extension, stainless-steel security plates to doors, and a new internal glazed door to separate office areas. A custom boardroom table incorporating motorised power and data connections was also installed. Extensive landscaping works completed the project, transforming the surrounding areas into a modern, secure and professionally presented school environment.

→
Carlton South Public School – Accessibility & Facility Upgrades

Carlton South Public School – Accessibility & Facility Upgrades

Carlton South Public School underwent facility and accessibility upgrades, including the installation of steel mesh screening around the demountable buildings. The staff car park was also upgraded to incorporate three designated accessible parking bays with compliant shared zones, improving safe and equitable access for people with mobility requirements.

→
Rydalmere Public School – Internal Room Upgrade

Rydalmere Public School – Internal Room Upgrade

Rydalmere Public School underwent an internal upgrade focused on improving safety, accessibility and the overall learning environment. Existing sliding doors were removed to eliminate potential trip hazards, followed by installation of new vinyl flooring and fresh internal painting. The completed upgrade gives the room a clean, modern and refreshed appearance.

→
Crestwood Public School – Seating Area Upgrade

Crestwood Public School – Seating Area Upgrade

Crestwood Public School’s seating area was revitalised with a strong focus on safer student movement, improved access and usability. Uneven ground was excavated and re-levelled, with new synthetic grass installed to provide a smooth, durable and low-maintenance surface for students to safely move through and enjoy the area. Drainage was upgraded to reduce water build-up and potential slip hazards, while new bollards and fencing provided greater separation and protection for students and staff. The completed upgrade transformed the previously under utilised space into a safe, accessible and functional area for everyday student use.

→
Waterfall Public School – Covered Pathway Works

Waterfall Public School – Covered Pathway Works

The works involved construction and upgrade of a covered pathway to provide students and staff with improved weather protection and safe access between school facilities. Works included structural supports, roofing, associated finishes and making good of surrounding areas to provide a durable and functional covered walkway.

→
Bald Face Public School Covered Walkway

Bald Face Public School Covered Walkway

Baldface Public School received a new covered walkway connecting the existing external building to the demountable classroom. The upgrade provides students and staff with safer, all-weather access between buildings, improving student movement while providing protection from rain and other weather conditions throughout the school day.

→